Moreton-Project-3

Deception Bay & Redcliffe Pedestrian Bridge Replacement

October 14, 2018 John Pilotti 0

Pedestrian Bridges around the Moreton Bay Council were in disrepair and as part of the council upgrades SULA Ltd were engaged by builder Tony Agnew to construct the Deception Bay and Redcliffe pedestrian bridges. Project Details Date: Completed in 2015 Location: Deception Bay & Redcliffe Category: Commercial

Electrical-Consultant-for-PNG-IPA

Stage 1 Electrical Consultant for PNG-IPA Building Upgrades

October 14, 2018 John Pilotti 0

Ausaid’s Technical Enabling Unit in the process of upgrading buildings at PNG-IPA. SULA was engaged by TEU to assess the condition of existing electrical infrastructure and make recommendations to ensure sufficient electrical infrastructure is available for the implementation of the new buildings. The assessment included a 7 day power survey of the entire institute and a current maximum demand and actual load assessment. Recommendations in the SULA report included upgrades of existing infrastructure complete with … [Read more]

Laga-Industries-Power

Laga Industries Power Analysis

October 14, 2018 John Pilotti 0

Laga Industries Power Bills have been excessive in the last 12 months. SULA was engaged to conduct a power survey and thermal imaging and produce a report detailing how Power was being charged to Laga with recommendations of how Laga can reduce this cost. The report included a thermal imaging report of all electrical infrastructure on site to identify hot joints which is a source of power wastage as well as seven days of power … [Read more]

WestPac-Storage

Lawes Rd Storage Facility Door replacement

October 14, 2018 John Pilotti 0

Westpac had recently converted a residential property into a storage facility. SULA was engaged by Westpac to change out the aluminium and glass sliding door of the unit into a large industrial timber sliding door to alloweasier transition of storage goods. Sula also fabricated a drain crossing to allow for a pallet jack to move smoothly in and out of the unit Project Details Date: Completed in 2015 Location: Lawes Rd Storage Facility, Port Category: … [Read more]

WestPac-ATM

SVS Taurama and SNS North Waigani ATM Refurbishment

October 14, 2018 John Pilotti 0

SULA refurbished the SVS Taurama and Stop N Shop North Waigani ATM sites to ensure compliance to Westpac standards as they had previously been non-compliant. Project Details Date: Completed in 2015 Location: SVS Taurama & SNS North Waigani Category: Commercial  

Private-Residence-3

Private Residence Guesthouse Fitout

October 13, 2018 John Pilotti 0

Builder Barry Marshall engaged SULA Ltd for fit out of a Guest house on a private property in Carseldine. SULA Ltd fitted out the kitchen, laundry, bathrooms, garage and bedrooms. Project Details Date: Completed in 2015 Location: Carseldine Category: Residential Construction

Westpac-Logo

Westpac Bank (PNG) Office Relocations

October 13, 2018 John Pilotti 0

SME Relocation & Call Centre Relocation SULA relocated and ran new UPS & GPO circuits to new and relocated desks for Westpac as they re-shuffled their Department locations within their new Port Moresby Branch and Waigani Corporate Centre. Project Details Date: Completed in 2015 Location: Westpac Corporate Centre & Westpac Port Moreby Category: Commercial